Equipment

Certified and Maintained for the highest value at the wellsite.

  • All equipment is maintained by full-time mechanics 24 hour a day coverage
  • 100-point inspection before and after each job
  • Manufacturer recommended service plan to ensure the highest efficiency
  • PM schedules
  • In depth preventative maintenance plan to prevent any possible downtime

Elements of a Successful Preventive Maintenance (PM) Program

Preventive maintenance (PM) is an essential component of all successful maintenance program for commercial motor vehicles. Through preventive maintenance, vehicles are inspected, repaired, and maintained in such a way that defects are prevented from surfacing in the first place, before a violation or accident can occur. 

Wireline Trucks

  • Fleet

PCE Packages

  • 5k and 10k Pressure Control Packages

Cranes

  • 45-50 Ton Cranes

Hydraulic Latch Systems

equipment-content